A Wet Kiln Firing – 2/23/2021
Yesterday I had the day off from my job at the paper factory. At 8:00 am I went and filled 3 gas canisters at Tractor Supply because they charge by the gallon and not by the fill and it’s much cheaper. They also fill them all the way up. I loaded 10 raku pots for bisque and could not fit all 13 in. I normally fire with a full shelf 1.5 inches down from the lid but the pots were to tall so I over fired the bottom to make up for it. They will be fine as they are somewhat large raku.
I got no other critical tasks completed as the gas kiln needs to be monitored every 30 min which is how I caught the leak. Some of the pots were a bit heavy also but having them on the woodstove was a huge time saver and help in drying them.
If I was living a second time:
On the way home there was a lady who was stuck real bad in a ditch. I drove home and got my snow shovel and chain and winter gear while my wife unloaded the groceries. Then I went back out and a few other were there with one chain but it was not long enough. I used my shovel and with my chain added the two kids that stopped were able to show off a bit by pulling the lady out. So in short they had a truck pull at 9:00pm on a corner. They must have known each other as they were talking a bit of smack and the one kid said that he would let the other guy go first and finish the job when they both end up stuck..I’m thinking maybe a Ford/Chevy riverly.
My Story Summary:
Getting scheduled tasks completed can be a challenge. There will be plenty of resistance to working new ways and getting use to keeping on track.ย There is only so much time in the bank and you should spend each penny of they in ways that are productive and enjoyable. If you do not make your own journey and plan others will make them for you no trouble. But you may regret not having a choice in the matter later.ย What hero’s journey are you on?


