A Wet Kiln – 2/22/2021

Yesterday after 12 hours work at the paper plant I had dinner with my wife for an hour then had to dig out my gas kiln Hera from the snow bank.

I realized I also left my shelves out there and the lid was stuck. I put the burner under and ran it on low for 2 hours to warm things up and to u freeze the lid. I also had to build a fire in the big wood stove to dry the shelves but all the wood was wet from being buried in the snow. I had to use my winter camping skills to start the wet wood by splitting it enough to give the flame a dry edge to start. I put the shelves inside to dry out.

If I were living today a second time:

I would have covered everything before we had snow and brought the shelves inside. As it took until 1am to get done. Huge effort loss on time. I also need to put up a kiln shed ASAP and get my big kiln Rosie hooked up to the big tank.

The things I enjoyed:

I was reading “Indestractable” by Nir Eyal on my breaks. I took the scenic route home from work and watched a YouTube show with the wife. I also did enjoy all my sufferings in some strange way. I super need to get it together. Hope to get the bisque firing going.

My story summary:

I have a huge problem with effort loss due to poor planning and decision making that is costing me a ton of money effort and time. Also I need to weigh opportunity cost. Just because it sounds like a good idea it does not mean it will be.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

5 + 15 =

This site uses Akismet to reduce spam. Learn how your comment data is processed.