– Creek Road Pottery LLC Newsletter – September 13th, 2026 –
Hello from rural Pennsylvania, where the electric came back after twenty-four hours out, the internet took even longer to sort itself out, and somewhere in between I ended up writing a Pottery Dailies post from a park bench by the river because it was the only place with a signal. The last two weeks have been a strange mix of forced quiet, family history, and the slow grind toward October’s shows. This newsletter covers Labor Day worked instead of taken off, a modem rebuilt like it was the year 2000, September 11th remembered through a bowl of ice cream, and the ongoing argument I keep having with myself about self-judgment.
The arch on Ana is ninety percent finished and calling to me every time I walk down the back porch steps. The glaze reformulation is underway. The shows in October are close enough now that inventory has stopped being a someday problem and become a today problem. Here is the full report.
Laboring on Labor Day
I worked Labor Day this year, which is not new, as the schedule has fallen on the holiday weekend the last several years running. They paid well for it, enough to cover the cat’s vet bill and some of the clay bill, and I have thirty years in manufacturing behind me now to know that overtime, when it is available, is the thing that keeps a household steady. Ten of those years were at the big potato chip factory, where my Uncle Will worked pest control and sanitation and once had the whole plant shut down so he could fog it for flies. He got me that job after high school, and looking back, my working life has been a set of steps. Farming led to the chip factory. The chip factory led to the paper factory. Each one prepared me for the next without me quite realizing it at the time.
I have never worked for a union in thirty years of manufacturing, and I have always felt I got paid fairly for what I did. I know that is not everyone’s experience, and unions matter a great deal for people who do not have that same relationship with their employer. Rather than making pots, I spent Labor Day laboring. How lucky I am to have had the choice.

Writing by the River
With the house internet down, I ended up writing a post from a local park by the river in Laceyville, just me, the birds, and the occasional car crossing the bridge. Losing the connection at home forced a kind of creativity I would not have chosen on my own but was grateful for once I was sitting there. I have been thinking about how long some of my projects take to finish, and whether that length of time is actually a problem. I have wanted to design a baking dish for years, and the slow thinking has finally given it real shape. Like a slow-moving river, some projects just need the time to work themselves out, as long as you know when good enough is good enough and actually finish.
The wood kiln is the project that has tested that patience most. The arch is ninety percent complete. The bricks near the top are not lining up the way they need to, and the project has stalled there for longer than I would like. I cannot let it sit unfinished through another winter. It needs to be done and test-fired soon, which means setting aside a full day to work through the arch issue before I can move on to the chimney stack.
Wired Like It’s 2000
The internet outage led to new equipment, an upgrade, and then nothing working at all until I hardwired the modem directly into the tower like it was two decades ago. The whole ordeal reminded me how often we get gaslit by systems that are broken by design, told to unplug and replug something as if the fault must be ours, when the truth is the system itself was never built to work the way it claims to. A router that needs the internet to connect to the internet is a design failure, not a user error.
I think that lesson applies well beyond modems. When a system does not work the way it should, it is fine to push back and say so, even if the people on the other end think you have lost your mind. I give myself and anyone reading this permission to build a smaller system outside the broken one when needed. Enough people doing that eventually forces the larger system to change or disappear. In the meantime, keep the old cords in a box in the basement. You may need them again.
Ice Cream on September 11th
September 11th came around again this year, and I still remember exactly where I was. I was at my grandparents’ house, watching the towers fall on their television, when my grandfather, who had Alzheimer’s at the time, started to grow anxious from the imagery. My grandmother turned off the television and suggested ice cream instead. The three of us sat in silence and ate it while the world outside came undone. I still think about how she knew exactly what to do in that moment.
I believe, quoting Mark Twain, that as an American I should love my country all the time and my government only when it deserves it. Looking back at what came after that day, the wars, the surveillance, the disinformation used to justify decisions that cost too many lives and too much money, I do not think we learned as much as we should have.
The Judge in the Room
I wrote this month about the difference between looking at your work honestly and judging it, which turned out to be two very different things once I actually separated them. Looking at a pot and noticing the foot is too heavy is information. Turning that observation into a verdict about your worth as a maker is something else entirely, and it is the thing that quietly convinces good makers to quit. Marcus Aurelius wrote that we suffer more from our opinion about a thing than from the thing itself, and a cracked pot only becomes a referendum on my abilities because I decide to make it one.
I am trying to ask better questions now. What happened here, and what would I do differently, rather than what is wrong with me. The first set of questions keeps me at the wheel. The second one used to keep me away from it more often than I would like to admit.

Snoring by the End
I also gave myself permission this month to write something a little sillier than usual, admitting that after more than nine hundred posts, not all of them can be good, and that I rarely go back to read the old ones out of fear of what I might find. Writing about a stalled internet connection, a squawking chicken shoved through a cardboard box by an enterprising eight-year-old at the Washington County Fair, and my own tendency to talk to myself out loud gave both me and hopefully my readers a break from the heavier philosophical lifting. Not every post needs to carry Marcus Aurelius on its back.
Looking Toward October
The glaze reformulation is underway in earnest now. Two of my base glaze ingredients are no longer mined, so I am using up what I have while working toward an ash glaze base using wood ash from my own stove. I picked up Phil Rogers’ book Ash Glazes to guide the testing, since reformulating a glaze means making sure it still works with the clay body I am using, not just chasing a color I like. Between the glaze work, the arch that needs finishing, and three shows landing close together in October, September has turned into the month where all the planning either pays off or doesn’t.

Creek Road Pottery is at creekroadpottery.com. Pots, studio updates, shows, and the Collectors Club are all there. October brings the Covered Bridge and Arts Festival in Bloomsburg, the AOHW Studio Tour, and the Pumpkin Trail here at 917 Creek Road. The arch on Ana needs to be finished before winter, and the glaze testing needs to wrap up before the shows. If something catches your eye or you want to talk about visiting the studio, reach out directly. Thanks for reading. Thanks for being here.
Enjoyed this post? Get the Creek Road Pottery Newsletter delivered to your inbox twice a month. Subscribe on Substack.
Connect with Creek Road Pottery LLC:
Website | Shop | Collectors Club | The Pin Tool Podcast | Instagram | Bluesky

